There may be local zoning or deed restrictions pertaining to height and type of fence.
Commercial chain link fence installation instructions.
End posts have one hook up.
Next measure the total length of the fence and mark where each terminal post will go.
Find your boundary lines your fence posts should be at least 4 inside of the lines or the footings may go over into the.
11 steps of chain link fence installation step 1.
With the end of the spool firmly in your grasp slowly pull the wire along the inside of the fence line to the other.
Check all the regulations about fence setbacks type and height.
The bands will help hold the mesh in place once it s installed.
You ll want to dig your terminal posts first and then install your line posts.
Find and download specifications and drawings for all of ameristar s products.
For example a 4 high chain link fence requires three tension bands per hook up.
The ears of the band pointed to the.
Measure the length measure the boundary of the space you want to enclose to determine how much fencing fabric and top.
This fitting requires one 5 16 x 1 1 4 standard fence bolt and nut.
Slide tension bands onto each corner gate and end post.
Install an end band at the base of the terminal post.
Find surveyors pins if the fence is to be located near property lines or have the lot surveyed.
Corner posts have two hook ups.
Step 3 a hook up is each connection of chain link to an end or corner post.
Locate your property s line.
Put hinges and latch hardware onto the gate posts at roughly their final positions to install later.
Obtain necessary zoning and building permits.
Mark the fence location.
Chain link fence installation manual before you begin.
To install a chain link fence start by establishing your property lines and placing your post holes 4 inches inside those lines.
Use a rubber mallet to drive end post caps onto the gate corner and end.
All posts should be set about 4 inches inside the line.
Check out your property line setback requirements.
Step 4 place one brace band on first to use if bottom tension wire will be installed.
Slide a tension bar through the first row of chain link diamonds.
Lay it on the ground and cut the banding.